Mulai 18 Feb 2027, setiap baterai EV/LMT/industri di atas 2 kWh harus memiliki DPP valid.
ID manufacturers
DPP required for EU market access.
Textiles and footwear — 2028
The European Commission's working plan adds textiles and footwear in 2028. Brands and their contract manufacturers (Vietnam, Bangladesh, Cambodia, China) will need DPP systems in place by the delegated act's entry into force — typically 18 months after publication. Factories should start preparation in 2026.
Electronics and appliances — 2028–2029
Consumer electronics, household appliances, and IT equipment follow. South Korean (Samsung, LG), Japanese (Sony, Panasonic), and Chinese (Haier, Xiaomi, Lenovo) manufacturers selling in the EU will need DPP infrastructure. The scope is vast — a single product line may require thousands of individual DPPs.
Tyres, furniture, mattresses — 2029–2030
Later waves extend to tyres, furniture, mattresses, and additional product categories. Exporters in these sectors have more preparation time but should monitor delegated acts closely.
Steps 1-3
Register account. Use national identifier with country code prefix.
Step 4: QSeal
Obtain QSeal from QTSP with RA in your region.
Steps 5-7
Validation and activation.
One-time.
XAdES-LTA integration.
Volume pricing.
Annual customs audits.
Identity + API.
Name mismatch
#1 rejection cause.
No regional RA
Physical shipping = weeks.
Throughput
Test in sandbox.
Renewal
Plan 60-90 days ahead.
Registry ≠ customs
Customs verifies signatures.
For battery manufacturers: (1) Register VEO, (2) Obtain QSeal via eSign.AI, (3) Integrate XAdES-LTA API, (4) Sandbox testing, (5) Audit trail. Waiting until Q4 2026 = bottleneck.
Yes, if they take legal responsibility.







